Industrial Automation Series

    •  UPS power supply network management center
    •  UPS power supply network management center
    •  UPS power supply network management center
    •  UPS power supply network management center

    UPS power supply network management center

    Is suitable for power plants, substations, industrial and mining enterprises, telecommunications, banking and other power users as an AC 50Hz, the maximum operating voltage to 660V, the maximum operating current to the 5000A distribution system. As a machine room distribution, motor control and lighting distribution equipment, such as power distribution control. This series of products with high breaking capacity, dynamic thermal stability and good performance, advanced and reasonable structure, electrical program of practical series, strong versatility, various schemes of unit combination, a cabinet contained many circuits, save the area of beautiful appearance, high level of protection, safe and reliable, convenient etc. maintenance. Is the UPS industry system integrators must match the product, this product conforms to IEC439, GB/T251 "low voltage draw out type complete switchgear" standard. It is essential in the room of a product, it closely with the UPS, size can be customized, and can also be made into distribution box type. The specific scheme of distribution is decided by the project.
    Item No.: GF3000
    Brand: RongFu
    Category: Room supply system89
    Features Specifications Application
    First, the product function
    The total input voltage, current, frequency, power, power monitoring - distribution cabinet;
    - distribution cabinet various voltage and current, frequency, power, power monitoring;
    Switch state detection - switch;
    The pre - set various load capacity alarm, overload alarm, overpressure alarm;
    7 - inch color touch screen display and management of harmonic content, energy management, historical trends, load curve;
    - with sound and light alarm and remote monitoring interface;
    - surge, lightning strike (optional); overcurrent protection.
    Local liquid crystal display and panel operation to facilitate real-time query and monitoring;
    With intelligent monitoring function, compatible with a variety of computer room monitoring system.
    Two, product features
    1, the UPS power distribution cabinet, the appearance of the product, the standard configuration for the glass door can also be made of steel doors, door network.
    2, the overall structure of the novel, all of the zero sector are processed with imported CNC equipment. Each process has been rigorously tested to ensure the machining accuracy of each component.
    3, the materials used are the high quality cold rolled steel, South Korea imported aluminum zinc coated plate, galvanized plate made of zinc flowers, the surface by electrostatic dusting, reached the international advanced level.
    4, the appearance of luxury and highlight, UPS and machine use, distribution room adds infinite glory.
    5, the internal and functional units are installed in the circuit breaker according to the order of hierarchical arrangement. MCCB with fixed installation, the installation guide rail type miniature circuit breaker. To ensure the safety and convenience of operation and maintenance, and the design of a high degree of modularization, which provides a great convenience for the rapid and simple installation and fault maintenance.
    Three, the use of conditions
    1, ambient air temperature is not higher than +40, not less than -5. The average temperature within the 24h shall not be higher than +35. 
    2, the installation and use of the site, the use of the altitude of the site shall not exceed 2000M. 
    3, ambient air relative humidity at the maximum temperature of +40 degrees Celsius is not more than 50%, in a relatively low temperature allows a greater relative humidity. (90% degrees +20 for example) should be taken into account due to the effect of temperature changes may happen. 
    4, equipment installation and the tilt of the vertical plane is not more than 5%. 
    Equipment should be installed in places where there is no violent vibration and shock, as well as a place where electrical components are corroded.
    5, the user has special requirements can be negotiated with the manufacturer to resolve.
    Four, product advantage
    Can better meet your needs, the bit of your computer room distribution system to provide safe and reliable power supply system:
    - Reliability: all components are standardized, after testing manufacturers;
    Safety: front - panel isolation, to prevent contact with live parts;
    - simple: because of the use of prefabricated components, design and installation are very simple;
    Easy management: improve the monitoring system, the computer room management to the equipment running state can be real-time control, convenient management;
    You can also
    QQ online Tel:400-888-9885 30 minutes to get custom quotes